Housing association
senior apartment building

Appartment building of four floors, where bathrooms and toilets are being renovated and new window frames are being installed. The work is carried out while the building is inhabited by the residents.

Foto voor de vervanging van kozijn
The challenge

The renovation had to be carried out quickly and efficiently, including the replacement of the entire facade of both the living room and the bedroom. The focus was on improving comfort and saving energy, with minimal inconvenience for residents as an important condition.

The solution

A new synthetic facade with HR+++ glass has been chosen, featuring a custom-sized opening and an insulated Trespa panel with ducts for the Fresh-r Compac On-the-Wall. The entire facade was replaced within one day, and the installation of the Fresh-r unit took just 30 to 45 minutes. Ventilation in the bedroom and bathroom areas of the apartment is set up in a conventional and demand-controlled manner.

2

The basic model, the most commonly used because it can be installed anywhere. Bring fresh air and energy savings into your home efficiently and easily!

Can be installed by one person. Just two 130 mm holes through the wall. Drilling template, all mounting materials, and pipes including insulation are supplied. Commissioning not required.

Smallest decentralized HRV per m3 ventilation volume. Unobtrusive due to flat surfaces and slanted vertical angle. LED air quality indicator can be dimmed as standard.